Install shingles over the drip edge or gutter apron completely covering the flanges.
Gutter apron installation instructions.
This process prevents rainwater from getting behind the gutter causing rot and decay which will ultimately lead to a roof replacement.
The hangers have a slight angle to them and actually you screw through the apron portion right into the fascia just works out that way because of the angle of the hanger.
Gutter aprons take on an.
Then it is slipped under normal drip edge.
A gutter apron is a bent piece of flashing that tucks up under the shingles and over the gutter.
Gutter apron a specialized drip edge designed to direct water into the gutter system.
Where the gutter wraps around an outside corner first attach splice fittings to the corner piece with rivets connect one splice to the preceding length of gutter apron.
It starts under the first course of shingles and hangs over the roof sheathing.
Gutter apron is installed on the edge of the roof at eaves and hangs into the gutter.
The gutter lip and the apron lip go together so essentially you are extending the back of the gutter by 1 11 4 high.
Do not butt lengths of drip edge or gutter apron up against each other use a 1 1 2 inch overlap.
It s primary purpose is to direct water into gutters from the roof.
Working above grade is inherently dangerous be sure that proper fall protection measures are in place.
You may have to temporarily remove your hangers as you go or you can notch out the apron around them.
It s much easier to join sections on the ground than to work from the top of a ladder.
Cut a two inch long notch in the front lip of the gutter with tin snips to join a rain gutter section.
Install the next length of gutter and fasten it in place with hidden brackets and then rivet the splice connections.
Once the apron s in place fasten it with sheet metal screws.
Gutter flashing installation should be seen as a necessary step in the gutter replacement process.
Similar to a drip edge a gutter apron is a long piece of metal folded at about 120 degrees.
Project step by step 20 cutting the gutter.
The purpose of gutter flashing is to seal the gap from the roofing shingles to the gutter.